Today was a very productive paint day :) I was able to get the second coat of trim paint on the two large windows I shared w/ you on Friday done today....it was just too cold this weekend to work outside. We also got tons of power washing done (only above the garage is left for power washing now), we got the first coat of trim paint on a kitchen window on the right side of the house on, and the first coat of body paint on the right side (pictured below) done - minus the under hang that we will do together with the front part of the house above the brick and 2 large windows. It will all be this body color, including the gutters...
Oh, and we got the first coat on the cement wall near the stairs and the patio wall. It was really needing some paint and will probably need 3 coats before we are done...
Oh, and we got the first coat on the cement wall near the stairs and the patio wall. It was really needing some paint and will probably need 3 coats before we are done...
We are forecasted for some rain the next few days so my plan is to paint the entryway under the patio covering. It never gets rain in there and I can easily get 2 coats in a couple hours to finish this area off. And John will probably go out and finish power washing above the garage doors(even in the rain) on Wed if he has time before church...we'll keep you posted...
Comments